How to Delegate Weekly Client Status Updates
Delegate weekly client updates with source-backed progress, visible blockers, approved timing, and a named relationship reviewer.
A weekly client status update should answer the questions the client actually has: what moved, what is happening next, what needs their input, and whether the plan changed. An assistant can assemble the evidence and draft the message, while the account lead reviews the facts and owns the relationship.
Quick answer
Use the accepted project plan, approved task updates, and relevant client correspondence. Ask for a concise draft with completed work, current work, blockers, next decisions, and agreed dates. Keep internal commentary private and flag uncertain progress rather than filling the message with reassuring guesses.
Righthand's task delegation and email management can support preparation. Sending and shared-system updates require the appropriate account connection and authorization.
Define the update's source and cutoff
Specify which project record is accepted and when the assistant should take the snapshot. A Friday update should not imply that a Monday plan is current if the team changed it on Thursday.
Ask for source links in the internal review version. The client-facing message may not need every internal reference, but the account lead should be able to verify a completed deliverable or changed date quickly.
Separate work completed internally from work delivered to the client. If the design is ready for review but has not been shared, say that accurately. If approval is outstanding, do not call the item complete in a way that hides the dependency.
Use a stable but flexible structure
A reliable update can include:
- Progress: the meaningful change since last week.
- Current work: what the team is doing now.
- Client input: the specific item or decision required.
- Next milestone: the accepted date or an explicit uncertainty.
- Changes: anything the account lead needs to explain.
Keep the message focused. Routine task detail belongs in a linked project view when the client needs it. The assistant should not add a long narrative just to make a quiet week look busy.
An illustrative weekly update
A creative agency has completed the first layout, is waiting for final product images, and has not confirmed the next review time. The assistant drafts: layout ready for review; image placement pending the approved files; proposed review options awaiting confirmation.
It does not say “everything is on track for Friday” because the missing images affect the plan and Friday is not accepted. The account lead reviews the dependency and decides how to discuss timing with the client.
The final message includes a clear request for the remaining images and a proposed review window. After authorization, the assistant reports the sending result. A sent update does not establish that the client supplied the files or accepted the time.
A status-update brief
Draft this week's client update from the accepted project plan, current owner updates, and client thread. Use a Friday-noon snapshot. Include meaningful progress, current work, client inputs needed, next milestone, and any plan changes. Distinguish internally finished work from delivered or approved work. Link sources in a separate review section. Keep staffing, margin, and internal debate private. Flag missing evidence or conflicting dates. Do not promise revised timing or send until the account lead approves.
Add your preferred tone and the exact recipient. The assistant can preserve a clear structure while using the language that fits the relationship.
Close the loop on client replies
A status message can generate feedback, new requests, or an approval. Ask the assistant to separate those categories and route decisions to the account lead. Do not automatically add a new request to the accepted scope.
Maintain an open-input list so next week's update shows whether the client response resolved the blocker. Otherwise, the same request may reappear week after week without an owner.
Review accuracy and usefulness rather than word count. A short update that exposes the actual dependency is better than a confident message that conceals it.
FAQ
Can the assistant send the update every week?
Only within a supported account and standing authority you define. Start with account-lead review while you establish the source and promise boundaries.
What should it say in a quiet week?
Report the real state and next step. Do not invent progress. If work is waiting, explain the dependency and needed input.
Should internal project links go to the client?
Only approved client-facing links with appropriate access. Keep the reviewer evidence separate when it contains internal material.